GLWA NE Flow Control Facility
Detroit, Michigan
Safely rigged, picked, and set this 2 ton west wall of the junction chamber of the GLWA NE Flow Control Facility. We had to pre tie the wall steel and corner bars as one due to limited space in the excavation. Our team noticed an installation issue ahead of time, developed a plan to maneuver the obstacle safely and efficiently.
- General Contractor
- Concrete Placement
- Application
- Rebar Installation
- Project Status
- Completed